Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTeesside Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Teesside Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Teesside Wind Farm (Wind , Active) Location in the UK : England, teeside Type of installation: Wind on/offshore: off Turbines :27 Capacity : 62 MW Approx Date of 1st power generation: July 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
June 2013 All 27 turbines at the 62MW windfarm have been installed and 13 of them are already generating electricity. The Teesside project is owned jointly by EDF Energy and EDF Energies Nouvelles and managed by their joint venture EDF Energy Renewables.
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register : Warrenby generation substation Toddpoint Road Warrenby Redcar TS10 5AU England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Teeside Offshore Wind Farm 62 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2514 / N00460W
District:
|
Applicant: |
EDF Energy - Northern Offshore Windfarm Ltd
Application :
R/2004/0305/FF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
27 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
62.1 |
Site Address: |
Coast of Coatham Sands at Redcar, the nearest within a mile of the beach
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
458470 / 458470
|
Development Status: |
Operational
|
Application Submitted: |
3/22/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/1/2012
|
|
|
Generator Live |
8/31/2013
|
This Record Last Updated: |
5/18/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Teesside windfarm
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00024RPEN
|
Capacity: |
61100
|
Status: |
Live
|
Accreditation Date: |
3/22/2005
|
|
|
Commission Date: |
7/5/2013
|
|
|
Applicant: |
Teesside Windfarm Ltd
|
Applicant Address: |
EDF Energy Renewables
52 Grosvenor Gardens
London
SW1W 0AU
England
|
Address: |
Warrenby generation substation
Toddpoint Road
Warrenby
Redcar
TS10 5AU
England
|
Site Name: |
Teesside windfarm
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01170FWEN
|
Capacity: |
61100
|
Status: |
Live
|
Accreditation Date: |
3/22/2005
|
|
|
Commission Date: |
7/5/2013
|
|
|
Applicant: |
Teesside Windfarm Ltd
|
Applicant Address: |
EDF Energy Renewables
52 Grosvenor Gardens
London
SW1W 0AU
England
|
Address: |
Warrenby generation substation
Toddpoint Road
Warrenby
Redcar
TS10 5AU
England
|
|
Assumptions: Capacity: 61100kW 61.1 MW, Thus over the month Capacity * 720 hours per month = 43992 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 20835 | 34.10% | Issued | 01/02/2018 | | | 18186 | 29.76% | Issued | 01/01/2018 | | | 22635 | 37.05% | Issued | 01/12/2017 | | | 21365 | 34.97% | Issued | 01/11/2017 | | | 20920 | 34.24% | Issued | 01/10/2017 | | | 23323 | 38.17% | Issued | 01/09/2017 | | | 13815 | 22.61% | Issued | 01/08/2017 | | | 13947 | 22.83% | Issued | 01/07/2017 | | | 14065 | 23.02% | Issued | 01/06/2017 | | | 17788 | 29.11% | Issued | 01/05/2017 | | | 14415 | 23.59% | Issued | 01/04/2017 | | | 14401 | 23.57% | Issued | 01/03/2017 | | | 16008 | 26.20% | Redeemed | 01/02/2017 | | | 20611 | 33.73% | Redeemed | 01/01/2017 | | | 15215 | 24.90% | Redeemed | Dec-16 | 0 | 34572 | 17286 | 28.29% | Issued | Nov-16 | 0 | 33098 | 16516 | 27.03% | Issued | Oct-16 | 0 | 29249 | 14625 | 23.94% | Issued | Sep-16 | 0 | 31777 | 15889 | 26.00% | Issued | Aug-16 | 0 | 30269 | 15134 | 24.77% | Issued | Jul-16 | 0 | 24252 | 12126 | 19.85% | Issued | Jun-16 | 0 | 19354 | 9750 | 15.96% | Issued | Jun-16 | 0 | 19354 | 9750 | 15.96% | Issued | May-16 | 0 | 30632 | 15316 | 25.07% | Issued | Apr-16 | 0 | 27958 | 13979 | 22.88% | Issued | Mar-16 | 0 | 29692 | 14846 | 24.30% | Redeemed | Feb-16 | 0 | 39457 | 19728 | 32.29% | Redeemed | Jan-16 | 0 | 46309 | 23155 | 37.90% | Redeemed | Dec-15 | 0 | 54547 | 27273 | 44.64% | Redeemed | Nov-15 | 0 | 47204 | 23602 | 38.63% | Redeemed | Oct-15 | 0 | 23186 | 11593 | 18.97% | Redeemed | Sep-15 | 0 | 17978 | 9040 | 14.80% | Redeemed | Aug-15 | 0 | 29744 | 14872 | 24.34% | Redeemed | Jul-15 | 12777 | 25554 | 12777 | 20.91% | Redeemed | Jun-15 | 14031 | 28062 | 14031 | 22.96% | Redeemed | May-15 | 19455 | 38910 | 19455 | 31.84% | Redeemed | Apr-15 | 12196 | 24392 | 12196 | 19.96% | Redeemed | Mar-15 | 22487 | 44975 | 22487 | 36.80% | Redeemed | Feb-15 | 17752 | 35503 | 17752 | 29.05% | Redeemed | Jan-15 | 25029 | 50058 | 25029 | 40.96% | Redeemed | Dec-14 | 19809 | 39617 | 19809 | 32.42% | Redeemed | Nov-14 | 11463 | 22927 | 11463 | 18.76% | Redeemed | Oct-14 | 16729 | 33458 | 16729 | 27.38% | Redeemed | Sep-14 | 4514 | 8889 | 4514 | 7.39% | Redeemed | Aug-14 | 12852 | 25704 | 12852 | 21.03% | Redeemed | Jul-14 | 6384 | 12637 | 6384 | 10.45% | Redeemed | Jun-14 | 4071 | 8023 | 4071 | 6.66% | Redeemed | May-14 | 7750 | 15500 | 7750 | 12.68% | Redeemed | Apr-14 | 5068 | 10058 | 5068 | 8.29% | Redeemed | Mar-14 | 16618 | 33235 | 16618 | 27.20% | Redeemed | Feb-14 | 9682 | 19364 | 9682 | 15.85% | Redeemed | Jan-14 | 7234 | 14203 | 7234 | 11.84% | Redeemed | Dec-13 | 17734 | 35468 | 17734 | 29.02% | Redeemed | Nov-13 | 14468 | 28937 | 14468 | 23.68% | Redeemed | Oct-13 | 22073 | 44145 | 22072 | 36.12% | Redeemed | Sep-13 | 13241 | 26483 | 13241 | 21.67% | Redeemed | Aug-13 | 9722 | 19445 | 9722 | 15.91% | Redeemed | Jul-13 | 2184 | 4331 | 3159 | 5.17% | Redeemed |
|
Capacity: 124.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/15/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|