Sorry I found no matches, Please try again. 176
vid = 3184pws_id = 353820pws_id = 353820
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.219.48.116 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Teesside Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Teesside Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Teesside Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, teeside    
Type of installation: Wind    on/offshore: off
Turbines :27  Capacity : 62 MW
Approx Date of 1st power generation: July 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

June 2013 All 27 turbines at the 62MW windfarm have been installed and 13 of them are already generating electricity. The Teesside project is owned jointly by EDF Energy and EDF Energies Nouvelles and managed by their joint venture EDF Energy Renewables.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

: Warrenby generation substation Toddpoint Road Warrenby Redcar TS10 5AU England

 Associated Companies.

Relationship Company (For: Teesside )
ConsultantAMEC
OperatorEDF Energy Renewables
DeveloperEDF Energy Renewables

 DECC Data on this Project: Teesside :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Teeside Offshore Wind Farm     62 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: DECC (S36)
Site ID and Reference: 2514 / N00460W     District:
Applicant: EDF Energy - Northern Offshore Windfarm Ltd     Application : R/2004/0305/FF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 27 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 62.1
Site Address: Coast of Coatham Sands at Redcar, the nearest within a mile of the beach
 
County: Offshore Region: Offshore
OS Coordinates: 458470 / 458470
Development Status: Operational
Application Submitted: 3/22/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2012    
Generator Live 8/31/2013 This Record Last Updated: 5/18/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Teesside: Wind :

Site Name: Teesside windfarm
Generator Type: Off-shore wind (RO code = RP)
Scheme : RO Generator ID: R00024RPEN
Capacity: 61100 Status: Live
Accreditation Date: 3/22/2005    
Commission Date: 7/5/2013    
Applicant: Teesside Windfarm Ltd
Applicant Address: EDF Energy Renewables 52 Grosvenor Gardens London SW1W 0AU England
Address: Warrenby generation substation Toddpoint Road Warrenby Redcar TS10 5AU England

Site Name: Teesside windfarm
Generator Type: Off-shore wind (REGO code = FW)
Scheme : REGO Generator ID: G01170FWEN
Capacity: 61100 Status: Live
Accreditation Date: 3/22/2005    
Commission Date: 7/5/2013    
Applicant: Teesside Windfarm Ltd
Applicant Address: EDF Energy Renewables 52 Grosvenor Gardens London SW1W 0AU England
Address: Warrenby generation substation Toddpoint Road Warrenby Redcar TS10 5AU England
 
Assumptions: Capacity: 61100kW 61.1 MW,
Thus over the month Capacity * 720 hours per month = 43992 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 20835 34.10% Issued
01/02/2018 18186 29.76% Issued
01/01/2018 22635 37.05% Issued
01/12/2017 21365 34.97% Issued
01/11/2017 20920 34.24% Issued
01/10/2017 23323 38.17% Issued
01/09/2017 13815 22.61% Issued
01/08/2017 13947 22.83% Issued
01/07/2017 14065 23.02% Issued
01/06/2017 17788 29.11% Issued
01/05/2017 14415 23.59% Issued
01/04/2017 14401 23.57% Issued
01/03/2017 16008 26.20% Redeemed
01/02/2017 20611 33.73% Redeemed
01/01/2017 15215 24.90% Redeemed
Dec-16 034572 17286 28.29% Issued
Nov-16 033098 16516 27.03% Issued
Oct-16 029249 14625 23.94% Issued
Sep-16 031777 15889 26.00% Issued
Aug-16 030269 15134 24.77% Issued
Jul-16 024252 12126 19.85% Issued
Jun-16 019354 9750 15.96% Issued
Jun-16 019354 9750 15.96% Issued
May-16 030632 15316 25.07% Issued
Apr-16 027958 13979 22.88% Issued
Mar-16 029692 14846 24.30% Redeemed
Feb-16 039457 19728 32.29% Redeemed
Jan-16 046309 23155 37.90% Redeemed
Dec-15 054547 27273 44.64% Redeemed
Nov-15 047204 23602 38.63% Redeemed
Oct-15 023186 11593 18.97% Redeemed
Sep-15 017978 9040 14.80% Redeemed
Aug-15 029744 14872 24.34% Redeemed
Jul-15 1277725554 12777 20.91% Redeemed
Jun-15 1403128062 14031 22.96% Redeemed
May-15 1945538910 19455 31.84% Redeemed
Apr-15 1219624392 12196 19.96% Redeemed
Mar-15 2248744975 22487 36.80% Redeemed
Feb-15 1775235503 17752 29.05% Redeemed
Jan-15 2502950058 25029 40.96% Redeemed
Dec-14 1980939617 19809 32.42% Redeemed
Nov-14 1146322927 11463 18.76% Redeemed
Oct-14 1672933458 16729 27.38% Redeemed
Sep-14 45148889 4514 7.39% Redeemed
Aug-14 1285225704 12852 21.03% Redeemed
Jul-14 638412637 6384 10.45% Redeemed
Jun-14 40718023 4071 6.66% Redeemed
May-14 775015500 7750 12.68% Redeemed
Apr-14 506810058 5068 8.29% Redeemed
Mar-14 1661833235 16618 27.20% Redeemed
Feb-14 968219364 9682 15.85% Redeemed
Jan-14 723414203 7234 11.84% Redeemed
Dec-13 1773435468 17734 29.02% Redeemed
Nov-13 1446828937 14468 23.68% Redeemed
Oct-13 2207344145 22072 36.12% Redeemed
Sep-13 1324126483 13241 21.67% Redeemed
Aug-13 972219445 9722 15.91% Redeemed
Jul-13 21844331 3159 5.17% Redeemed

 Calculations


Capacity: 124.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/15/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 124.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353820

Project Info
Dogger Bank C Offshore Wind Farm - Sofia
Details of Sofia (previously known as “Dogger Bank TEESSIDE B”) Offshore Windfarm – Variation 5

Construction Starts on World’s Largest Offshore Wind Project
Dogger Bank Wind Farms, a joint venture between SSE Renewables and Equinor, is made up of three offshore wind farm sites in the North Sea, Creyke Beck A , Creyke Beck B, and TEESSIDE A.

Taking shape: TEESSIDE's latest Energy-from Waste facility
Work is well under way on Wilton 11 - the latest energy-from-waste facility in TEESSIDE’s growing green energy hub. (Haverton Hill)

EDF Renewables: Projects

Hartlepool 'highest' wind turbine scheme proposed
Permission is being sought for three single turbines over 200m (655ft) high in Hartlepool, TEESSIDE at Graythorp Industrial Estate, Brenda Road West Industrial Estate and Tofts Road West.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School